Road construction and recycling

In order to develop the country's road and rail transport infrastructure, Azar Pasilo Company offers a wide range of engineering services depending on the demands of employers and executives.
Road construction and recycling

Transportation is the key to development. Transportation can be defined as the issue of ensuring the movement of people and goods in a desirable and economical way. In this regard, it is necessary to pay attention to the alignment of transportation development programs with other sectors, including the environment. The construction of roads in natural and sensitive areas leads to a decrease in the value and effective functions of such areas, because in addition to the direct destruction caused by the construction and operation, it increases access to pristine natural areas and as a result human encroachment on these Areas. According to the topic of road ecology in the fields of planning, protection, management, design and environmental policy, the development of roads can be done with appropriate technical-economic studies and feasibility studies. One of the cases of these studies is the use of recycled materials in road paving.

Service Summary

In order to develop the country’s road and rail transport infrastructure, Azar Pasilo Company offers a wide range of engineering services depending on the demands of employers and executives. These services are categorized under the following headings:

  • Design recognition and feasibility studies
  • Basic and first stage studies
  • Second stage and detailed studies
  • Workshop supervision and quality control
  • Technical services during implementation under the title of excellent supervision
  • Study and design control services
  • Project management services in the form of 2 and 3 factor contracts
  • A set of engineering services in the form of design and construction contracts
the details

There are 4 general methods for managing construction waste and rubbish, which include: 1) reduction in origin, 2) reuse, 3) recycling, 4) underground burial; However, due to the limited capacity of landfills, suitable mineral resources, negative environmental effects and economic issues have become factors in the processing and recycling of solid waste in the world. Since for the construction of different layers of road pavement, it is necessary to provide quality and suitable materials, which for this purpose are usually taken from natural resources, which in addition to high cost of preparation and transportation, itself disrupts the environment and the natural shape of the earth. Becomes; The purpose of this article is to investigate the potential of using solid waste, such as construction debris, plastics, glass and crushed rubber in the preparation of asphalt and pavement layers with emphasis on non-pollution and environmental protection for road construction.

Special projects